ABB wins order for variable-speed drive system
Published by Angharad Lock,
Digital Assistant Editor
World Cement,
ABB has announced it has secured an order from Tianjin Cement Industry Design & Research Institute Co. Ltd, a subsidiary of SINOMA Group, for a highly energy efficient variable-speed drive solution for a dual pinion ball mill in the PT Semen Bosowa Maros cement plant, which is located in Indonesia.
ABB previously delivered a cement grinding line to the plant, including a gearless mill drive (GMD) and a vertical mill with ABB slip ring motors.
“ABB’s solution was favored for several reasons, not least because of the high-level of efficiency offered by the permanent magnet motors used and the absence of a gearbox in the system, which maximises availability and reliability,” commented Rachid Hamdani, Project Director of PT Semen Bosowa Maros.
This will be the first drive system for a grinding application with permanent magnet motors in this power range. The solution has the highest efficiency among all variable-speed drive systems and will raise productivity at the plant, while minimising electricity consumption.
Edited from press release by Angharad Lock
Read the article online at: https://www.worldcement.com/asia-pacific-rim/11012016/abb-wins-order-for-variable-speed-drive-system-2113/
You might also like
World Cement Podcast
Tune into Episode 2 of the World Cement podcast to hear the second half of the CCUS-focused panel discussion from EnviroTech 2024.
Ashes To Innovation In Concrete
Grant Quasha, Eco Materials Technologies, reveals how the innovative use of coal ash and other supplementary cementitious materials is helping the concrete industry reduce its carbon footprint and improve performance.