Skip to main content

ABB wins order for variable-speed drive system

Published by , Digital Assistant Editor
World Cement,


ABB has announced it has secured an order from Tianjin Cement Industry Design & Research Institute Co. Ltd, a subsidiary of SINOMA Group, for a highly energy efficient variable-speed drive solution for a dual pinion ball mill in the PT Semen Bosowa Maros cement plant, which is located in Indonesia.

ABB previously delivered a cement grinding line to the plant, including a gearless mill drive (GMD) and a vertical mill with ABB slip ring motors.

“ABB’s solution was favored for several reasons, not least because of the high-level of efficiency offered by the permanent magnet motors used and the absence of a gearbox in the system, which maximises availability and reliability,” commented Rachid Hamdani, Project Director of PT Semen Bosowa Maros.

This will be the first drive system for a grinding application with permanent magnet motors in this power range. The solution has the highest efficiency among all variable-speed drive systems and will raise productivity at the plant, while minimising electricity consumption.

Edited from press release by

Read the article online at: https://www.worldcement.com/asia-pacific-rim/11012016/abb-wins-order-for-variable-speed-drive-system-2113/

You might also like

World Cement podcast

World Cement Podcast

In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.

Listen for free today »

 

Responsible Capacity Growth, Powered by Your Data

As demand rises with urbanisation, manufacturers must meet growth targets while advancing 2030 and 2050 decarbonisation goals. AI Optimisation (AIO) technology is empowering teams with AI expertise to transform operations and accelerate their journey toward a smarter, more sustainable future.

 
 

Embed article link: (copy the HTML code below):