Skip to main content

Sinoma’s raw mill achieves smooth load running

Published by
World Cement,


Sinoma’s TRM 36.4 raw mill achieved smooth load running on the first attempt. The mill forms part of the Kazakhstan Standard Cement 2nd Line 1 MTPA Clinker Production Line Project which is contracted by TCDRI. The successful load running marks the second line successfully entered into the period of load trial running and commissioning.

The smooth load running of a raw mill signifies imminent clinker production. The project team will take it as a turning point, further strengthening various preparation works ahead of ignition to lay the foundation for achieving smooth production.


Edited from source by Joseph Green. Source: Sinoma 

Read the article online at: https://www.worldcement.com/africa-middle-east/14092015/sinoma-raw-mill-achieves-smooth-load-running-539/

You might also like

Hanson supplies concrete for new Cumbria bridge

A new stainless steel and concrete single-span bridge, the first of its kind in the UK to be designed to withstand extreme weather conditions, has opened in Pooley Bridge, Cumbria.

 
 

Embed article link: (copy the HTML code below):