Skip to main content

Gebr. Pfeiffer to supply mill for Saudi Arabia’s Readymix

World Cement,


General contractor Chengdu Design & Research Institute of Building Materials Industry Co. Ltd has ordered a cement mill from Gebr. Pfeiffer SE on behalf of Saudi Arabia-based Readymix.

The VRM will be of the type MPS 3070 BC and will have a drive power of 1100 kW. It will grind granulated blastfurnace slag at a rate of 30 tph and OPC at 46 tph to a fineness of 4000 cm2/g and 3600 cm2/g, respectively.

The mill is scheduled for delivery in 2015.


Adapted from press release by

Read the article online at: https://www.worldcement.com/africa-middle-east/13052015/gebr-pfeiffer-cement-mill-ordered-for-saudi-arabia-readymix-830/

You might also like

Sustainability 2020

Sustainability 2020

An online conference focusing on sustainability in the cement industry. Join us for presentations covering topics such as: Alternative fuels, air pollution control, dust control, carbon capture and more. Register for free today »

 
 
 

Embed article link: (copy the HTML code below):