Gebr. Pfeiffer to supply mill for Saudi Arabia’s Readymix
General contractor Chengdu Design & Research Institute of Building Materials Industry Co. Ltd has ordered a cement mill from Gebr. Pfeiffer SE on behalf of Saudi Arabia-based Readymix.
The VRM will be of the type MPS 3070 BC and will have a drive power of 1100 kW. It will grind granulated blastfurnace slag at a rate of 30 tph and OPC at 46 tph to a fineness of 4000 cm2/g and 3600 cm2/g, respectively.
The mill is scheduled for delivery in 2015.
Adapted from press release by Louise Fordham
Read the article online at: https://www.worldcement.com/africa-middle-east/13052015/gebr-pfeiffer-cement-mill-ordered-for-saudi-arabia-readymix-830/
You might also like
World Cement Podcast
In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.
Molins announce first quarter results
Net profit reached €48 million, equivalent to earnings per share of 0.73 euros, 6% lower than the same period of the previous year.