Skip to main content

Fives to install FCB Flash dryer in Honduras

Published by , Editor
World Cement,


French engineering company, Fives, has been awarded a contract to supply a new FCB Flash dryer at a cement plant in Honduras. The FCB Flash dryer will be equipped with a new Pillard HeatGen hot gas generator.

The new system will be installed on the existing cement ball mill at Cementos Del Norte’s Bijau plant in Honduras. The ball mill was originally supplied and installed by Fives FCB in 2001 for production of 90 tph of pozzolanic cement.

Since the original installation, however, both pozzolana content and moisture have increased significantly, creating the need for the FCB Flash dryer. Once in operation, the grinding plant drying capacity will be enhanced, with a corresponding benefit to hourly production.

Read the article online at: https://www.worldcement.com/the-americas/15062017/fives-to-install-fcb-flash-dryer-in-honduras/

You might also like

World Cement podcast

World Cement Podcast

Alfie Lloyd-Perks sits down with Christopher Ashworth, President of FLSmidth Cement, for a discussion covering: the journey to decarbonisation, the importance of partnerships and collaboration, the role of digitalisation, and more...

Listen for free today »

 

Mapei opens a new plant in Egypt

The Mapei Group strengthens its industrial presence in North Africa, with the opening of a new production plant in Egypt, in the 10th of Ramadan City, north-west of Cairo.

 
 

Embed article link: (copy the HTML code below):