Skip to main content

Fives to install FCB Flash dryer in Honduras

Published by , Editor
World Cement,


French engineering company, Fives, has been awarded a contract to supply a new FCB Flash dryer at a cement plant in Honduras. The FCB Flash dryer will be equipped with a new Pillard HeatGen hot gas generator.

The new system will be installed on the existing cement ball mill at Cementos Del Norte’s Bijau plant in Honduras. The ball mill was originally supplied and installed by Fives FCB in 2001 for production of 90 tph of pozzolanic cement.

Since the original installation, however, both pozzolana content and moisture have increased significantly, creating the need for the FCB Flash dryer. Once in operation, the grinding plant drying capacity will be enhanced, with a corresponding benefit to hourly production.

Read the article online at: https://www.worldcement.com/the-americas/15062017/fives-to-install-fcb-flash-dryer-in-honduras/

You might also like

The World Cement Podcast - Understanding AI in Cement

The World Cement Podcast welcomes Scott Ziegler, CEO of CemAI to explore the role of AI in the cement industry, how to keep staff engaged with the transition, and the importance of cybersecurity.

Tune in to the World Cement Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):