Fives to install FCB Flash dryer in Honduras
Published by Jonathan Rowland,
Editor
World Cement,
French engineering company, Fives, has been awarded a contract to supply a new FCB Flash dryer at a cement plant in Honduras. The FCB Flash dryer will be equipped with a new Pillard HeatGen hot gas generator.
The new system will be installed on the existing cement ball mill at Cementos Del Norte’s Bijau plant in Honduras. The ball mill was originally supplied and installed by Fives FCB in 2001 for production of 90 tph of pozzolanic cement.
Since the original installation, however, both pozzolana content and moisture have increased significantly, creating the need for the FCB Flash dryer. Once in operation, the grinding plant drying capacity will be enhanced, with a corresponding benefit to hourly production.
Read the article online at: https://www.worldcement.com/the-americas/15062017/fives-to-install-fcb-flash-dryer-in-honduras/
You might also like
World Cement Podcast
In the latest episode of the World Cement Podcast, we are joined by Eoin Condren, Corporate Development Executive Director for Ecocem. Topics covered include: the importance of investing in innovation, the role of policy and legislation in supporting next generation cement products, and a look at some exciting new technologies.
Cemex invests in electric mixers across its EMEA Operations
Cemex continues to reduce the carbon footprint of its EMEA supply chain operations through investments into new electric ReadyMix trucks across the region.