Fives and Cooperativa La Cruz Azul SCL sign two contracts
Published by Robyn Wainwright,
Assistant Editor
World Cement,
Cooperativa La Cruz Azul SCL awarded two new contracts to Fives FBC due to the previous successes with FCB Horomill.
Cooperativa La Cruz Azul SCL has awarded Fives FCB two contracts for the engineering, supply, construction, and commissioning of two raw meal grinding plants on a turnkey basis.
Both plants are situated in Mexico, each grinding plant will be fitted with one FCB Horomill 4000 mm grinding mill and one FCB Classifier 6500mm.
The first grinding unit, which will be installed in the Cruz Azul Hidalgo plant, will have a capacity of 280 tph of raw meal and will be dedicated to the new clinker line no. 10 project.
The second, with a capacity of 300 tph raw meal, will be installed in the Oaxaca Lagunas plant as part of the new clinker line no. 5 project.
The compact footprint, low electrical consumption, and zero water operation achieved with the FCB Horomill were factors in aiding the selection of Fives by Cooperativa La Cruz Azul SCL.
Read the article online at: https://www.worldcement.com/the-americas/09012018/fives-and-cooperativa-la-cruz-azul-scl-sign-two-contracts/
You might also like
The World Cement Podcast
In this special joint episode of the World Cement Podcast, and Cementing Europe’s future, the podcast of CEMBUREAU, David Bizley and Koen Coppenholle take a deep dive into the Clean Industrial Deal and a discussion of what it means for the European cement industry.
Listen for free today at www.worldcement.com/podcasts or subscribe and review on your favourite podcast app.
Shaping The Future Through Shredding
Gary Moore, UNTHA Shredding Technology GmbH, highlights the global momentum behind alternative fuels and the role of advanced shredding in shaping cement’s low-carbon future.