Loesche wins contract in Germany
Karl Kraft Steinwerke oHG, Heidenheim an der Brenz, in Germany placed an order on 23 July, 2010 for a Loesche Mill Type LM 19.20 D for the grinding of limestone.
The Loesche mill will be integrated into an existing but recently modified building.
It is planned to produce two different types of limestone. The main product with a fineness of 1% R90 µm at a capacity of 25 tph will be discharged via classifier. The secondary product is grit, which will be extracted via a screw feeder.
Loesche will not only deliver the vertical grinding mill but also a rotary valve, the mill fan, the ducting and the hot gas generator.
The installation is planned to be concluded within only 5 months from the signing of the contract. It is estimated that the Loesche Mill Type LM 19.20 D will ready for operation by December.
Read the article online at: https://www.worldcement.com/europe-cis/25102010/loesche_wins_contract_in_germany/
You might also like
World Cement Podcast
Tune into Episode 2 of the World Cement podcast to hear the second half of the CCUS-focused panel discussion from EnviroTech 2024.
Cemex invests in renewable energy in Poland
Cemex has signed an agreement with EDP Energia Poland to build solar installations at several Cemex plants in Poland, with a total capacity of over 14 MWp.