Skip to main content

Ruukki Metals selects Loesche mills for steel production

World Cement,


Finnish steel producer Ruukki Metals Oy is converting its blast furnaces at the Raahe site in Finland from oil injectors to Pulverized Coal Injection (PCI).

The new injection system is supplied by Claudius Peters Projects. Two Loesche mills LM 23.2 D will be installed to handle the coal grinding.

The production rate of the mills is 33 tph at a fineness of 20% > 0.09 mm and a gearbox capacity of 460 kW. The plants are expected to commence operation in 3Q15, with a delivery period of eight months.


Adapted from press release by Katie Woodward

Read the article online at: https://www.worldcement.com/europe-cis/11082014/loesche-mills-selected-for-cost-efficient-steel-production-122/

You might also like

The World Cement Podcast - CleanTech & Venture Capital

Our guest for this episode of the World Cement Podcast is Alfredo Carrato, Venture Capital Advisor for CEMEX Ventures. Listen in to the conversation as World Cement's Senior Editor, David Bizley, and Alfredo discuss the role of venture capital and cleantech in enabling the cement industry's green transition.

Tune in to the World Cement Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):