Skip to main content

KHD to install first Pyroclon Redox calciner and burner

Published by
World Cement,


Askale Cimento has awarded KHD a contract to install the first ever Pyroclon Redox Calciner and Burner at its Van plant in the East Anatolian region of Turkey.

The technology is designed to allow the plant to decrease its NOx emissions and stay within the new limits without requiring secondary measures such as SNCR or SCR to be put in place. This makes it the cleanest calciner technology in the world. It will also save Askale the additional cost of investment, operation and maintenance of such units.

Depending on the operational results achieved by this pilot project, Askale will implement this new technology in its other clinker production lines, located in Gümüshane and Erzurum.

KHD guaranteed Askale Cimento the legal NOx limits (<800 mgNO2/Nm3 dry @ 10% O2), but the expected result is a larger reduction potential compared to all other LowNOx calciner technologies in the market.

Commissioning of the new system is scheduled to take place at the end of 2017.

Read the article online at: https://www.worldcement.com/europe-cis/09112016/khd-to-install-first-pyroclon-redox-calciner-and-burner/

You might also like

 KHD

KHD Technical Webinar Series

Over the coming weeks, World Cement will be hosting a series of technical webinar presentations from KHD! Each presentation will be led by industry experts and provide a detailed discussion of KHD’s product offerings to the cement industry.

Find out more and register for the series »

 

GlobalData: UK construction output rebounds

The company forecasts that construction output in the UK will contract by 10.3% in 2020 as a whole, with the steep contraction in Q2 2020 being partially offset by improvements during the second half of the year.

 
 

Embed article link: (copy the HTML code below):