Gebr. Pfeiffer to provide mill to Kaspi plant in Georgia
Published by Rebecca Bowden,
Assistant Editor
World Cement,
In November 2016, Gebr. Pfeiffer SE received an order to supply a vertical roller mill that will be set up in HeidelbergCement's new 3000 tpd kiln line at its Kaspi plant.
The type MPS 4000 B mill is equipped with an SLS 3750 B classifier and has been designed for a capacity of 270 tph raw meal. The mill will be delivered with an enlarged housing to allow raw material with up to 10% moisture to be dried almost exclusively with the available preheater gases.
The order was placed through the Chinese General Contractor Sinoma Chengdu.
Commissioning of the plant is scheduled for 2018.
Read the article online at: https://www.worldcement.com/asia-pacific-rim/10012017/gebr-pfeiffer-to-provide-mill-to-kaspi-plant-in-georgia/
You might also like
Ideas on emergency interting
Achim Rott, robecco, describes the mechanics behind emergency inerting systems, explaining the correct procedures to ensure the buildup of combustible dust does not lead to fires and explosions.