Skip to main content

Gebr. Pfeiffer to provide mill to Kaspi plant in Georgia

Published by , Assistant Editor
World Cement,


In November 2016, Gebr. Pfeiffer SE received an order to supply a vertical roller mill that will be set up in HeidelbergCement's new 3000 tpd kiln line at its Kaspi plant.

The type MPS 4000 B mill is equipped with an SLS 3750 B classifier and has been designed for a capacity of 270 tph raw meal. The mill will be delivered with an enlarged housing to allow raw material with up to 10% moisture to be dried almost exclusively with the available preheater gases.

The order was placed through the Chinese General Contractor Sinoma Chengdu.

Commissioning of the plant is scheduled for 2018.

Read the article online at: https://www.worldcement.com/asia-pacific-rim/10012017/gebr-pfeiffer-to-provide-mill-to-kaspi-plant-in-georgia/

You might also like

World Cement podcast

World Cement Podcast

In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.

Listen for free today »

 

Responsible Capacity Growth, Powered by Your Data

As demand rises with urbanisation, manufacturers must meet growth targets while advancing 2030 and 2050 decarbonisation goals. AI Optimisation (AIO) technology is empowering teams with AI expertise to transform operations and accelerate their journey toward a smarter, more sustainable future.

 
 

Embed article link: (copy the HTML code below):