Skip to main content

Tianjin Cement orders two LM 53.3+3 CS Loesche mills

Published by , Digital Assistant Editor
World Cement,


Loesche has announced that Tianjin Cement Industry Design & Research Institute Co. Ltd. has ordered two LM 53.3+3 CS Loesche mills for grinding clinker.

For the PT Semen Baturaja cement plant, the customer Tianjin Cement Industry Design & Research Institute Co., Ltd. has placed an order for two type LM 53.3+3 CS Loesche mills for clinker grinding. Both of the mills have been designed with a capacity of 175 t/h and material is ground to a fineness of 3400 Blaine. Every mill is fitted with a gearbox with a power of 4200 kW.

The lead time for the main components of the mill is 9 months and the gearboxes are supplied within 12 months. The commissioning of both vertical roller mills is planned for the end of next year.

The order follows a previous delivery, in 2012, of the LM 46.2+2 CS Loesche mill, which is still in operation.

In 2013, Loesche GmbH established the subsidiary company PT Loesche Indonesia with an office in Jakarta.

Edited from press release by

Read the article online at: https://www.worldcement.com/asia-pacific-rim/05012016/loesche-receives-two-lm-53-cs-mills-order-265/

You might also like

 
 

Embed article link: (copy the HTML code below):