Skip to main content

Gebr. Pfeiffer wins order for vertical roller mill for Iraqi market

Published by , Digital Assistant Editor
World Cement,


The Chinese General Contractor Sinoma (Suzhou) Construction Co Ltd., Kunshan, has placed an order with Gebr. Pfeiffer SE for the supply of an MPS 5000 B, which will be installed at Saman cement plant. The mill, featuring an installed drive power of 4000 kW, will be grinding = 500 tph of cement raw material to a product fineness of = 10% residue on 80 µm.

This is the sixth mill of this type to be supplied to Iraq by Gebr. Pfeiffer SE.

The mill is to be delivered in 2016.

Edited from press release by

Read the article online at: https://www.worldcement.com/africa-middle-east/28082015/gebr-pfeiffer-wins-order-for-vertical-roller-mill-for-iraqi-market-453/

You might also like

World Cement podcast

World Cement Podcast

In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.

Listen for free today »

 

Responsible Capacity Growth, Powered by Your Data

As demand rises with urbanisation, manufacturers must meet growth targets while advancing 2030 and 2050 decarbonisation goals. AI Optimisation (AIO) technology is empowering teams with AI expertise to transform operations and accelerate their journey toward a smarter, more sustainable future.

 
 

Embed article link: (copy the HTML code below):