Fives installs raw meal grinding plant at QNCC
Published by Jonathan Rowland,
Editor
World Cement,
French engineering group, Fives, has installed the raw meal grinding plant at Qatar National Cement Co.’s (QNCC) new cement production line. The installation was carried out ton 29 March 2017.
The raw meal grinding plant includes a 6.6 MW FCB-B mill. The raw mill shell weighs 198 t and its 17.2 m long and 6.4 m in diameter. The shell was moved and erected using a self-propelled modular transport.
The erection of the raw meal grinding plant follows the commissioning of two FCB B mills for cement grinding in January and February. The new production line will have a capacity of 5000 tpd.
Read the article online at: https://www.worldcement.com/africa-middle-east/27042017/fives-install-raw-meal-grinding-plant-at-qncc/
You might also like
The World Cement Podcast
In this special joint episode of the World Cement Podcast, and Cementing Europe’s future, the podcast of CEMBUREAU, David Bizley and Koen Coppenholle take a deep dive into the Clean Industrial Deal and a discussion of what it means for the European cement industry.
Listen for free today at www.worldcement.com/podcasts or subscribe and review on your favourite podcast app.
Amrize debuts as independent, publicly traded company
Amrize announces its debut today as an independent, publicly traded company with the completion of its 100% spin-off from Holcim.