Skip to main content

Dyckerhoff Beton supplied concrete for 24-hour pour

Published by , Editor
World Cement,


Dyckerhoff Beton, a division of Buzzi Unicem, delivered more than 2000 m3 of concrete last month to Bickhardt Bau for a bridge restoration project.

The bridge measures 130 m long and consists of four sections that form a single, continuous span over the roundabout where it is located.

The concrete pour was a big project, with concrete coming from two plants using a fleet of 14 truck-mixers that were all in use at the same time. It started at 6pm on 4 July and continued through to 6 pm the following day.

The roundabout was closed to traffic while the class C 45/55 concrete was pumped at height by means of two pumps. The consistency of the concrete was constantly monitored both at the plants and on site. The CEM III/A 42.5N cement in the concrete was produced at Dyckerhoff’s Amöneburg plant.


Adapted from press release by

Read the article online at: https://www.worldcement.com/product-news/12082014/dyckerhoff-beton-supplied-concrete-for-24-hour-pour-281/

You might also like

The World Cement Podcast - CleanTech & Venture Capital

Our guest for this episode of the World Cement Podcast is Alfredo Carrato, Venture Capital Advisor for CEMEX Ventures. Listen in to the conversation as World Cement's Senior Editor, David Bizley, and Alfredo discuss the role of venture capital and cleantech in enabling the cement industry's green transition.

Tune in to the World Cement Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):