Cemex strengthens London’s sand and gravel supply with a new quarry
Cemex is strengthening its sand and gravel supply in London by opening a new quarry in Shepperton, Surrey, UK.
Cemex is strengthening its sand and gravel supply in London by opening a new quarry in Shepperton, Surrey, UK.
Heidelberg Materials signs an agreement with Pronto to deploy their autonomous haulage system (AHS) to over 100 trucks operating across more than a dozen sites worldwide in a first wave.
Heidelberg Materials reports strong 2024 results, with €21.2 billion in revenue, maintaining last year's level despite lower volumes.