Gebr Pfeiffer awarded contract
Published by Rebecca Bowden,
Assistant Editor
World Cement,
Etex Group awarded Gebr Pfeiffer the contract for the modernisation of its Sinat GmbH works in Hartershofen.
The installed Pfeiffer MPS 125 A vertical roller mill, which has been in operation at the works since 1990, will be replaced with a vertical mill of the type MPS 160 B. This new mill will be set up in an annex next to the old grinding plant. To be noted that a major part of the existing equipment will be reused. This procedure will ensure that the current production can be maintained as long as possible during the phase of implementation.
The scope of services comprises delivery of the mill, proportioning equipment, hot gas generator, process ducting, electrics, buildings and foundations including installation and connection works as well as integration into the existing process.
Switch-over and commissioning of the grinding plant are planned for December 2016.
Adapted from press release by Rebecca Bowden
Read the article online at: https://www.worldcement.com/europe-cis/22082016/gebr-pfeiffer-awarded-contract-126/
You might also like
World Cement Podcast
In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.
Queens Carbon secures US$10M in seed funding for low carbon cement
Backed by Clean Energy Ventures and Buzzi Unicem USA, Queens Carbon will leverage funding to scale its energy-efficient cement production platform.