Skip to main content

Gebr Pfeiffer awarded contract

Published by , Assistant Editor
World Cement,


Etex Group awarded Gebr Pfeiffer the contract for the modernisation of its Sinat GmbH works in Hartershofen.

The installed Pfeiffer MPS 125 A vertical roller mill, which has been in operation at the works since 1990, will be replaced with a vertical mill of the type MPS 160 B. This new mill will be set up in an annex next to the old grinding plant. To be noted that a major part of the existing equipment will be reused. This procedure will ensure that the current production can be maintained as long as possible during the phase of implementation.

The scope of services comprises delivery of the mill, proportioning equipment, hot gas generator, process ducting, electrics, buildings and foundations including installation and connection works as well as integration into the existing process.

Switch-over and commissioning of the grinding plant are planned for December 2016.


Adapted from press release by

Read the article online at: https://www.worldcement.com/europe-cis/22082016/gebr-pfeiffer-awarded-contract-126/

You might also like

World Cement podcast

The World Cement Podcast

In this special joint episode of the World Cement Podcast, and Cementing Europe’s future, the podcast of CEMBUREAU, David Bizley and Koen Coppenholle take a deep dive into the Clean Industrial Deal and a discussion of what it means for the European cement industry.

Listen for free today at www.worldcement.com/podcasts or subscribe and review on your favourite podcast app.

Apple Podcasts  Spotify Podcasts  YouTube

 
 
 

Embed article link: (copy the HTML code below):