Rohrdorfer builds CO2 separation plant
The plant, which is being built in cooperation with the Andritz Group, is scheduled to go into operation by the end of June 2022.
The plant, which is being built in cooperation with the Andritz Group, is scheduled to go into operation by the end of June 2022.