Skip to main content

Intercem to optimise seconday fuel dosing system

Published by , Editor
World Cement,


German engineering company, Intercem, has been commissioned to optimize the secondary fuel dosing system at a German cement plant.

The scope of the contract includes disassembly on site, refurbishment of the trough chain conveyors still to be used, construction of a new bunker and installation of the refurbished screws.

This combination of new and refurbished parts ensures that the costs for the customer can be kept as low as possible. The engineering, as well as the assembly of the new components and the provision of the necessary cranes, hoists, and other equipment, are also included.

Read the article online at: https://www.worldcement.com/europe-cis/07022019/intercem-to-optimise-seconday-fuel-dosing-system/

You might also like

World Cement podcast

World Cement Podcast

In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.

Listen for free today »

 
 
 

Embed article link: (copy the HTML code below):