Skip to main content

HERACLES have signed a Front-End Engineering Design (FEED) contract with Air Liquide for the OLYMPUS carbon capture project

Published by , Editorial Assistant
World Cement,


HERACLES, a member of Holcim Group, signed today a Front-End Engineering Design (FEED) contract with Air Liquide Engineering and Construction (E&C) for the CO2 capturing, liquefaction, storage and dispatch facilities as part of HERACLES’ large-scale OLYMPUS carbon capture & storage (CCS) project in Greece.

OLYMPUS is one of the largest CCS projects in Europe, enabling the HERACLES plant's CO2 emissions in the area of Milaki to capture and store 1 million tons of CO2 annually. In 2023, the project was selected for a grant from the EU Innovation Fund and is scheduled to enter full operation in 2029.

HERACLES group, a leader in sustainable building materials in Greece has selected Air Liquide, a world leader in gases, technologies and services for Industry and Health, to work jointly to upgrade and equip the Milaki plant with innovative and fully integrated systems for CO2 capture, which will be accomplished by oxygen enrichment and cryogenic separation. Captured CO2 will be liquefied and transported by sea to the Greek offshore sequestration facility of Prinos in the northern part of the Aegean Sea.

This agreement represents a crucial milestone towards the FID (final investment decision) of OLYMPUS CCS project. It underscores HERACLES’ commitment to fulfil net zero pledge by materialising a robust large-scale CO2 capturing unit.

The FEED study will provide a detailed blueprint to address technical considerations , define the layout, estimate the investment cost for the design, operation and innovative integration of the carbon capture plant into the existing production facilities and pave the way for the subsequent equipment procuring and construction phases.

Dimitris Chanis, CEO of HERACLES Group stated: “This collaboration with Air Liquide, embodies a shared vision of two industry leaders that are committed to innovation and environmental responsibility. For HERACLES, OLYMPUS CCS project is a key lever to accelerate our net zero journey. We are committed to driving forward the industry’s decarbonisation and energy transition to a more sustainable future’’.


Click here for free registration to World Cement

Read the article online at: https://www.worldcement.com/europe-cis/02012025/heracles-have-signed-a-front-end-engineering-design-feed-contract-with-air-liquide-for-the-olympus-carbon-capture-project/

You might also like

World Cement podcast

World Cement Podcast

In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.

Listen for free today »

 

Molins announce first quarter results

Net profit reached €48 million, equivalent to earnings per share of 0.73 euros, 6% lower than the same period of the previous year.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LafargeHolcim news