Skip to main content

Holcim Indonesia’s Tubafa plant is to install a Loesche VRM

World Cement,


Loesche has won a contract to supply grinding technology to Holcim Indonesia’s Tubafa cement plant. A vertical roller mill will be installed on the plant’s new cement production line, which will be a replica of the Tubafa 1 line. The LM 56.3+3, with a 5200 kW gearbox, will grind clinker, gypsum and limestone at a rate of 260 tph at <3% R 45 µm.

Loesche will also supply a dedusting filter and fan, metal detectors, magnetic separator, slide gates, rotary valve and a hot gas generator.

FOB delivery is scheduled for January 2014.

Adapted from press release by Louise Fordham

Read the article online at: https://www.worldcement.com/asia-pacific-rim/27082013/holcim_indonesia_tubafa_cement_plant_to_install_loesche_vrm_179/

You might also like

World Cement podcast

World Cement Podcast

In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.

Listen for free today »

 

TITAN Group release first quarter results

Titan Group had a positive start to the year with sales up by 2.4% at €638.4m, thanks to firm pricing, sustained volumes in cement, and growth in volumes in other core products.

 
 

Embed article link: (copy the HTML code below):