Holcim Indonesia’s Tubafa plant is to install a Loesche VRM
Loesche has won a contract to supply grinding technology to Holcim Indonesia’s Tubafa cement plant. A vertical roller mill will be installed on the plant’s new cement production line, which will be a replica of the Tubafa 1 line. The LM 56.3+3, with a 5200 kW gearbox, will grind clinker, gypsum and limestone at a rate of 260 tph at <3% R 45 µm.
Loesche will also supply a dedusting filter and fan, metal detectors, magnetic separator, slide gates, rotary valve and a hot gas generator.
FOB delivery is scheduled for January 2014.
Adapted from press release by Louise Fordham
Read the article online at: https://www.worldcement.com/asia-pacific-rim/27082013/holcim_indonesia_tubafa_cement_plant_to_install_loesche_vrm_179/
You might also like
The World Cement Podcast - The changing face of cement in Europe
In this special joint episode of the World Cement Podcast and Cementing Europe’s Future, Senior Editor David Bizley is once again joined by Koen Coppelholle, CEO of Cement Europe (formerly CEMBUREAU). The two discuss the reasons behind the rebrand, a new action plan for cement, and the future of the industry.
Tune in to the World Cement Podcast on your favourite podcast app today.

