New packing plant order for Claudius Peters
Published by Joseph Green,
Editor
World Cement,
Holcim Vietnam has awarded a contract to Claudius Peters Projects for the delivery of a new packing plant for their plant in Thi Vai.
Holcim Vietnam was founded in 1994 and operates several grinding and cement plants in southern Vietnam. For the plant extension in Thi Vai, Claudius Peters is supplying a PACPAL plant with a capacity of 3600 bags/h. The scope of supply includes the silo feeding with aeroslide transport to the packing plant expansion. Furthermore, the PACPAL roto Fill type R12ZL, the PACPAL bag applicator type 3600 C as well as the bag discharge with cement feeding via a bucket elevator. A vibrating screen and a corresponding prebin have also been ordered from the PACPAL program.
In 2003 Claudius Peters already supplied a multicell silo and two 8 spout packing plants with capacities of 2400 bags/h to its premises. Claudius Peters is also responsible for the engineering layout of the involvement of the new PACPAL plant into the existing packing plant concept.
The delivery of the equipment is planned for the middle of August 2016 and the commissioning is scheduled for September 2016.
Adapted from press release by Joseph Green
Read the article online at: https://www.worldcement.com/asia-pacific-rim/27042016/packing-plant-order-claudius-peters-991/
You might also like
World Cement Podcast
In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.
Molins announce first quarter results
Net profit reached €48 million, equivalent to earnings per share of 0.73 euros, 6% lower than the same period of the previous year.