Hubei Mining’s iron ore project put into production
Published by Joseph Green,
Editor
World Cement,
The first ore grinding vertical mill TRM28.2 designed by Sinoma-tec was successfully put into production at Hubei Fengshan Mining Company’s 60 000 tpy iron ore project.
The iron ore vertical mill was put into production in December 2015, and reached the designed capacity on 4 January 2016. After grinding, the ore fineness reached R80mm<20%, dry basis yield 108 tph, vertical mill host power consumption 7.5kwh/t, and output and power consumption reached a guaranteed value, with the mill running smoothly.
This vertical mill is suitable for low grade ore grinding and purification. The successful production of the vertical mill has made a beneficial exploration for the application of the grinding equipment in the field of mining.
Edited from source by Joseph Green. Source: Sinoma
Read the article online at: https://www.worldcement.com/asia-pacific-rim/26012016/hubei-iron-ore-project-production-379/
You might also like
World Cement Podcast
In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.
Responsible Capacity Growth, Powered by Your Data
As demand rises with urbanisation, manufacturers must meet growth targets while advancing 2030 and 2050 decarbonisation goals. AI Optimisation (AIO) technology is empowering teams with AI expertise to transform operations and accelerate their journey toward a smarter, more sustainable future.