Skip to main content

A TEC provides know-how for cement plant erection in Angola

Published by , Editor
World Cement,


A TEC has supported Nova Cimangola during the construction of a greenfield cement plant “Nova Cimangola 2” project as EPCM (Engineering, Procurement & Construction Management) partner.

Since preparing the tender A TEC has coordinated all aspects and has supervised the erection. Up to five A TEC employees are continuously on site over the entire 30-month construction period. They monitor the establishment technically and ensure that both the schedule and the technical specifications are adhered to.

A TEC optimises the construction process with an eye for detail and an understanding of the whole. In addition A TEC employees lead a supplier quality assurance and ensure a smooth process. The plant, which will have a capacity to produce 2 million tpy of cement, will be finished by the beginning of 2017.


Adapted from press release by Joseph Green

Read the article online at: https://www.worldcement.com/africa-middle-east/03032016/atec-provides-know-cement-plant-erection-angola-621/

You might also like

World Cement podcast

World Cement Podcast

In the latest episode of the World Cement Podcast, Senior Editor David Bizley is joined by Dr Andrew Minson of the GCCA to discuss the ins and outs of the recently launched Low Carbon Ratings (LCR) system.

Listen for free today »

 

Molins announce first quarter results

Net profit reached €48 million, equivalent to earnings per share of 0.73 euros, 6% lower than the same period of the previous year.

 
 

Embed article link: (copy the HTML code below):