TCDRI has signed an EP contract with Votorantim Cimento Sanayi Ve Ticaret A.S., the Turkish subsidiary of the Votorantim Group. The contract for the 4500 tpd plant covers raw material crushing to cement bulk loading and is expected to last for 28 months. Work includes engineering and design, mechanical equipment supply, DAP transportation and site service.
This is TCDRI’s second project in Turkey and its third with the Votorantim group. This latest contract further strengthens the cooperation between the two companies and lays a solid foundation for further growth within Turkey.
Data from the Brazilian construction industry association states that 91% of all cement commercialised in Brazil in 2013 has some additive to supplement the clinker content.
Turkey’s Medcem Global Pazarlama AS has ordered a third road-mobile unloader from Siwertell, which will discharge cement at a rated capacity of 300 tph.