Skip to main content

Gebr. Pfeiffer to provide mill to Kaspi plant in Georgia

 

Published by
World Cement,

In November 2016, Gebr. Pfeiffer SE received an order to supply a vertical roller mill that will be set up in HeidelbergCement's new 3000 tpd kiln line at its Kaspi plant.

The type MPS 4000 B mill is equipped with an SLS 3750 B classifier and has been designed for a capacity of 270 tph raw meal. The mill will be delivered with an enlarged housing to allow raw material with up to 10% moisture to be dried almost exclusively with the available preheater gases.

The order was placed through the Chinese General Contractor Sinoma Chengdu.

Commissioning of the plant is scheduled for 2018.